Sprint 2

This week involved continued progress on documentation and planning, with a focus on finalizing foundational project materials. Use cases were completed, and work began on aligning the drone system architecture with the project’s overall system design. Although some team members were affected by illness, the webpage neared completion, requiring only ongoing updates moving forward. Progress on requirements and risk analysis was limited, pending feedback from an upcoming meeting with supervisors. Similarly, development of technical requirements and the Concept of Operations (ConOps) document is dependent on input from other disciplines and external reviewers. Meanwhile, integration of the remaining presentation content into the report was successfully completed.

Sprint Summary:

Task Table
Name Task Comments
Kasper Finish use cases and look into system architecture. Use cases finished, need to continue research into system architecture of the drones to map it to our architecture.
Eirik Finish the webpage. Stayed at home due to sickness the entire week, but the only thing missing now is to continously update during the project.
Kristian T Continue with requirements and risk analysis. Was also home due to sickness, but also needs to wait on feedback from KDA during the meeting and make the corrections next week.
Kristian M Finish requirements for electrical components. Also needs to wait on feedback from KDA and make changes the following week.
Ruben Finish ConOps and requirements. Needs the other disciplines to add technical aspects in ConOps. Needs KDA feedback on requirements.
Ulrik Implement the rest of the presentation. Finished implementing the presentation into the report.